PCH CIDEZAL

Cidezal

The name of this Small Hydro is a tribute to the company “Companhia Desenvolvimento Sapezal”, which took over the municipal administration in 1994. The company drilled wells and built the entire network of water and lighting for the city.

  • Installed Power: 17 MW
  • Assured Energy: 14,83 MW
  • Commencement of Commercial Operation: June 25, 2011
  • Concession Period: December 28, 2032
BACK TO PLANTS